Skip to main content
  • Paul Scherrer Institut PSI
  • PSI Research, Labs & User Services

Digital User Office

  • Digital User Office
  • DE
  • EN
  • FR
Paul Scherrer Institut (PSI)
Search
Paul Scherrer Institut (PSI)

Hauptnavigation

  • Research at PSIOpen mainmenu item
    • Research Initiatives
    • Ethics and Research integrity
    • Scientific Highlights
    • Scientific Events
    • Scientific Career
    • PSI-FELLOW
    • PSI Data Policy
  • Research Divisions and LabsOpen mainmenu item
    • Overview
    • Research with Neutrons and Muons
    • Photon Science
    • Energy and Environment
    • Nuclear Energy and Safety
    • Biology and Chemistry
    • Scientific Computing, Theory and Data
    • Large Research Facilities
  • Facilities and InstrumentsOpen mainmenu item
    • Overview
    • Large Research Facilities
    • Facilities
    • PSI Facility Newsletter
  • PSI User ServicesOpen mainmenu item
    • User Office
    • Methods at the PSI User Facilities
    • Proposals for beam time
    • Proposal Deadlines
    • Data Analysis Service (PSD)
    • EU support programmes
  • New ProjectsOpen mainmenu item
    • SLS 2.0
    • IMPACT
  • DE
  • EN
  • FR

Digital User Office (mobile)

  • Digital User Office

You are here:

  1. PSI Home
  2. Labs & User Services
  3. NES
  4. LRT
  5. Sacre
  6. Projects
  7. BSAF

Secondary navigation

Severe Accident Research Group

  • About SACRE
  • Team
  • Facilities
  • Tools and Codes
  • Projects
  • Teaching and Education
    • Master Theses and Trainee projects
    • PhD Theses
  • Scientific Highlight
  • Journal Publications
  • Conference Articles
  • Quality Management

Benchmark Study of the Accident at Fukushima (BSAF)

Analysis of the accident in the Fukushima Daiichi nuclear power station
Analysis of the accident in the Fukushima Daiichi nuclear power station

In March 2011 a major accident occurred at the Fukushima Daiichi nuclear power station, triggered by an extremely strong earthquake and the subsequent tsunami on the eastern coast of Japan. During the next days, devastation of the local area due to the flooding meant that vital power supplies were unavailable and other services were disrupted. The loss of power meant that vital safety equipment did not function as designed and recovery operations were severely hindered. During the accident, three units of the nuclear power plants suffered extensive damage to the reactors and buildings. It is widely believed that all three reactor cores experienced some melting, although the extent is as yet unknown. The consequent release of radioactive material meant that a large area surrounding the accident site had to be evacuated.

Paul Scherrer Institute (PSI) is taking part in an Organisation for Economic Cooperation and Development (OECD) project, Benchmark Study of the Accident at the Fukushima (BSAF) to reconstruct the events that occurred in March 2011. Eleven institutes from eight countries are participating. PSI is performing simulation of Unit 3, using the MELCOR code developed in the USA for simulation of whole plant accidents and made available to PSI via cooperative exchange agreement with the US Nuclear Regulatory Commission (NRC). The simulation task is a challenging one because only limited measurement data exist about the conditions inside the reactors. PSI participation in the project is supported by ENSI.

One of the important expected outcomes is an evaluation of the likely end-state of the reactor core which will help the owner of the damaged plant, the Tokyo Electric Power Company (TEPCO) to plan the removal of components from the reactor containment and the final decontamination. The exercise will advance the understanding of severe accident phenomena and contribute to further refinement of the computer models used to perform the simulations. The exercise will continue until September 2014. Toward the end, the results by each of the participants will be discussed at a joint meeting, with a view to formulating a collective view of the accident sequences and reactor end-states.

Publications

Analysis of the accident in the Fukushima Daiichi nuclear power station Unit 3 with MELCOR_2.1
L.Fernandez-Moguel, J.C.Birchley
Annals of Nuclear Energy 83, 193-215 (2015)
DOI: 10.1016/j.anucene.2015.04.021

Sidebar

General Contact

Severe Accidents and Source Term Mitigation

Paul Scherrer Institute
5232 Villigen PSI
Switzerland

Dr. Detlef Suckow
Group Leader a.i.
Office: OHSA/C04
Telephone: +41 56 310 4145
E-mail: detlef.suckow@psi.ch

Petra kull
Administration & Assistance
Office: OHSA/C18
Telephone: +41 56 310 2685
E-mail: petra.kull@psi.ch

top

Footer

Paul Scherrer Institut

Forschungsstrasse 111
5232 Villigen PSI
Switzerland

Telephone: +41 56 310 21 11
Telefax: +41 56 310 21 99

How to find us
Contact

Visitor Centre psi forum
School Lab iLab (in German)
Center for Proton Therapy
PSI Education Centre
PSI Guest House
PSI Gastronomie (in German)
psi forum shop

Service & Support

  • Phone Book
  • User Office
  • Accelerator Status
  • PSI Publications
  • Suppliers
  • E-Billing
  • Computing
  • Safety (in German)

Career

  • Working at PSI
  • Job Opportunities
  • Training and further education
  • Career Center
  • Vocational Training (in German)
  • PSI Education Center

For the media

  • PSI in brief
  • Facts and Figures
  • Media corner
  • Media Releases
  • Social Media

Follow us: Twitter (in English) LinkedIn Youtube Facebook Instagram Issuu RSS

Footer legal

  • Imprint
  • Terms and Conditions
  • Editors' login