Direkt zum Inhalt
  • Paul Scherrer Institut PSI
  • PSI Research, Labs & User Services

Digital User Office

  • Digital User Office
  • DE
  • EN
  • FR
Paul Scherrer Institut (PSI)
Suche
Paul Scherrer Institut (PSI)

Hauptnavigation

  • Research at PSIÖffnen dieses Hauptmenu Punktes
    • Research Initiatives
    • Research Integrity
    • Scientific Highlights
    • Scientific Events
    • Scientific Career
    • PSI-FELLOW
    • PSI Data Policy
  • Research Divisions and LabsÖffnen dieses Hauptmenu Punktes
    • Overview
    • Research with Neutrons and Muons
    • Photon Science
    • Energy and Environment
    • Nuclear Energy and Safety
    • Biology and Chemistry
    • Large Research Facilities
  • Facilities and InstrumentsÖffnen dieses Hauptmenu Punktes
    • Overview
    • Large Research Facilities
    • Facilities
    • PSI Facility Newsletter
  • PSI User ServicesÖffnen dieses Hauptmenu Punktes
    • User Office
    • Methods at the PSI User Facilities
    • Proposals for beam time
    • Proposal Deadlines
    • Data Analysis Service (PSD)
    • EU support programmes
  • DE
  • EN
  • FR

Digital User Office (mobile)

  • Digital User Office

Sie befinden sich hier:

  1. PSI Home
  2. Labs & User Services
  3. PSD
  4. SLS
  5. MS
  6. User Information

Sekundäre Navigation

MS

  • Status
  • User Information Ausgeklappter Submenü Punkt
    • Operation Schedule
    • Manuals
    • Computing/Controls
  • Staff
  • Beamline Layout
    • Source
    • Optics
  • Endstations
    • Powder Diffraction
      • PD - Description
      • PD - Detectors
      • PD - Mesquik
      • PD - Publications
      • PD - Research
    • Surface Diffraction
      • SD - Description
      • SD - Detectors
      • SD - Publications
      • SD - Research
  • Research
  • Publications
  • Scientific Highlights and News
  • Contacts

Info message

Dieser Inhalt ist nicht auf Deutsch verfügbar.

User Information

Beamtime scheduling

The scheduling periods and deadlines for calls for proposals can be found in detail at SLS Proposal Calls.
Beamlines Call schedule (non-PX)
Experimental Period 2019-II 2020-I
Call 2019/02/08 2019/08/08
Submission deadline 2019/03/15 2019/09/15
Start period 2019/07/01 2020/01/01
End period, Normal/Test/Pilot 2019/12/31 2020/06/30
EVALUATION closed closed

Proposals

Proposals can only be considered if they are submitted electronically using the SLS Digital Users Office (DUO).

The overbooking factor (i.e., the ratio of requested shifts to available shifts) at each station at the MS beamline is typically 2 - 3. Shortly after the submission deadlines (see above), the proposals are reviewed confidentially by an independent committee (Proposal Review Committee - PRC). After review, notification of success or failure is automatically sent to the main proposer by the DUO system. The successful proposals are then scheduled. Scheduling is an iterative procedure carried out by the beamline scientists [Phil Willmott (beamline manager and surface diffraction), Nicola Casati (powder diffraction), and Antonio Cervellino (powder diffraction), see Staff]. Every effort is made to accommodate the wishes of the users regarding the convenience of the allocated shift dates. It is therefore very important that the proposers fill out that part of the proposal in the DUO requesting information about preferred and inconvenient dates, as this considerably facilitates scheduling.

Long-term proposals extend over three scheduling periods. Justification for submitting a long-term proposal should be compelling. In general, proposals for experiments that are considered to be "high-risk" are unlikely to obtain long-term status until their feasibility has been proven. Even then, it should be apparent to the PRC, such as through publications in high-profile journals, that long-term status is justified. Scheduling of the machine and beamlines can be found at the SLS Operation Calendar.

Preparing before beamtime

General information on things that should be organized in advance of beamtime are described at PSI User Office - Before Arrival

It is recommended that the proposer contact the relevant beamline scientist (see Staff) to obtain any information required for preparing his/her experiment prior to the beamtime. He/she should first carefully check this website to see what is available at his/her endstation of interest. In addition, requests for dosimeters can be obtained by the DUO, while information about accommodation at the guesthouse and nearby hotels can be obtained here.

It is important that the forthcoming user has checked with the beamline scientist the following considerations:
  • Desired photon energy?
  • Does the user require polychromatic light (pink beam)?
  • Which mode of diffractometer operation (SD: vertical or horizontal)?
  • What sample environments are needed (temperature, pressure, gases, etc)?
  • Transmission of the sample at the desired photon energy?
  • Sample mounting possibilities and constraints?
  • Angular or spatial resolution?
Setting up an experiment is, in general, performed as part of the allocated beamtime, in other words, it is not expected that the previous user finishes early in order to allow the next user to prepare the experiment in advance. Under favourable circumstances, it may be possible to complete some part of setting up in the experimental hutch in advance. This depends on whether the hutch is being used by another user immediately prior to one's beamtime. Check with the relevant beamline scientist. Access to the experimental hutch before beamtime is more probable (though certainly not guaranteed!) at the surface diffraction station, due to the fact that, in contrast to the PD facility, it can remain open when the other two are being used. Changeover times from any one station to another requires about one hour.

Importing experimental equipment

It is strongly recommended that the user ensures that all necessary preparations have been made for the import of any equipment that needs to be checked through Swiss Customs. Failure to do this can lead to substantial delays and possible loss of some or all of the allocated beamtime. A comprehensive description of the necessary steps to take are given here, including contact details if there are any uncertainties or questions.

During beamtime

Shift Schedule
Morning Shift 07:00 - 15:00
Evening Shift 15:00 - 23:00
Night Shift 23:00 - 07:00
User support is available from 07.00 until 22.00 during the week, at the numbers given in Contact Numbers. At the weekend, the user should first contact the Control Room.

Machine status

The current beam status can be viewed at SLS Realtime Status page.

Mit Sidebar

Further information
  • Organize your journey
  • Before Arrival
  • How to get to PSI?
  • Your Stay At PSI
  • Safety
  • Safety Instructions

User Contact Points at PSI

PSI User Office
DUO Login

How to apply?

A short description of the procedures relevant to proposals at the PSI user facilities.

Call for Proposals

PX Beamlines: Call is open for proposals
More Information

All other Beamlines
08 February 2020: Call is open for proposals
More Information

EU Support for SLS-non-PX-users

Effective March 1, 2012 the funding for travel support and daily allowances will be only available through a application at BioStruct-X.
Find the complete information on the
EU Access Programmes Webpage


PSI Joint Users Association

Association representing the interests of PSI user community
top

Fussbereich

Paul Scherrer Institut

Forschungsstrasse 111
5232 Villigen PSI
Schweiz

Telefon: +41 56 310 21 11
Telefax: +41 56 310 21 99

Der Weg zu uns
Kontaktformular

Besucherzentrum psi forum
Schülerlabor iLab
Zentrum für Protonentherapie
PSI Bildungszentrum
PSI Guest House (in english)
PSI Gastronomie

Service & Support

  • Telefonbuch/​Personensuche
  • User Office
  • Accelerator Status
  • Publikationen des PSI
  • Lieferanten
  • E-Rechnung
  • Computing
  • Sicherheit

Karriere

  • Arbeiten am PSI
  • Stellenangebote
  • Aus- und Weiterbildung
  • Berufsbildung
  • PSI Bildungszentrum

Für die Medien

  • Das PSI in Kürze
  • Zahlen und Fakten
  • Medienkontakt
  • Medienmitteilungen
  • Social Media Newsroom

Folgen Sie uns: Twitter (deutsch) LinkedIn Youtube Issuu RSS

Footer legal

  • Impressum
  • Nutzungsbedingungen
  • Editoren-Login