Aller au contenu principal
  • Paul Scherrer Institut PSI
  • PSI Research, Labs & User Services

Digital User Office

  • Digital User Office
  • DE
  • EN
  • FR
Paul Scherrer Institut (PSI)
Rechercher
Paul Scherrer Institut (PSI)

Hauptnavigation

  • Research at PSIOuvrir ce point de menu principal
    • Research Initiatives
    • Research Integrity
    • Scientific Highlights
    • Scientific Events
    • Scientific Career
    • PSI-FELLOW
    • PSI Data Policy
  • Research Divisions and LabsOuvrir ce point de menu principal
    • Overview
    • Research with Neutrons and Muons
    • Photon Science
    • Energy and Environment
    • Nuclear Energy and Safety
    • Biology and Chemistry
    • Large Research Facilities
  • Facilities and InstrumentsOuvrir ce point de menu principal
    • Overview
    • Large Research Facilities
    • Facilities
    • PSI Facility Newsletter
  • PSI User ServicesOuvrir ce point de menu principal
    • User Office
    • Methods at the PSI User Facilities
    • Proposals for beam time
    • Proposal Deadlines
    • Data Analysis Service (PSD)
    • EU support programmes
  • DE
  • EN
  • FR

Digital User Office (mobile)

  • Digital User Office

Vous êtes ici:

  1. PSI Home
  2. Labs & User Services
  3. PSD
  4. SLS
  5. PXIII
  6. Status

Navigation secondaire

PXIII

  • Status
  • User Information
    • Operation Schedule
    • Beamline infrastructure
    • Remote Operation
    • Dewar shipping
    • Sample Changer
    • Data Transfer Service
    • Data Acquisition
    • Data Processing and Analysis
    • Useful Phone Numbers
    • Users Results
  • People
  • Beamline Layout
    • Source
    • Optics
  • Endstations
  • Crystallisation Facility
  • Macromolecular Crystallography Group
  • Publications
  • Scientific Highlights and News
  • Job Opportunities

Info message

Ce contenu n'est pas disponible en français.

Beamline Status

Resource Status Description
Optics and monochromator OK The beamline features a double-channel cut fixed-exit monochromator for X-rays in the range from 6 to 17.5 keV. Vertical collimation and focussing is achieved by mirrors
Status sample and environment OK The focussed beam size on the sample is 90 μm by 45 μm. Liquid nitrogen (100 K) or room temperature measurements possible, as well as in-situ diffraction screening (plate diffraction)
Endstations and detectors OK Multi-axis goniometer PRIGo, PILATUS 2M, Ketek Fluorescence detector
Manual mounting operation OK Fast manual mounting through a mini-hutch window
Sample changer operation OK Sample changer in operation, for caps/vials as well as for plate screening. Please refer to the TELL page
in situ X-ray diffraction screening (plates screening) NO Capabilities decommissioned in June 2020

Legend    OK      PROBLEMS

Sidebar

Further Information

  • Accelerator Staff (Contacts)
  • Accelerator Division (GFA)
    Organisation, activities and further information

View Full SLS Status

top

Pied de page

Paul Scherrer Institut

Forschungsstrasse 111
5232 Villigen PSI
Suisse

Téléphone: +41 56 310 21 11
Téléfax: +41 56 310 21 99

Comment nous trouver 
Formulaire de contact

Centre de visiteurs psi forum
Laboratoire élèves iLab (en allemand)
Centre de protonthérapie
Centre de Formation du PSI (en allemand)
PSI Guest House (en anglais)
PSI Gastronomie (en allemand)

Service & Support

  • ​Annuaire/Liste de contacts
  • User Office
  • Accelerator Status
  • Publications du PSI
  • Fournisseurs
  • E-facture
  • Computing (en anglais)
  • Sicherheit (en allemand)

Carrière

  • Travailler au PSI
  • Offres d'emploi
  • Formation initiale et formation continue
  • Formation professionnelle (en allemand)
  • Centre de Formation du PSI

Pour les médias

  • Le PSI en bref
  • Chiffres et faits
  • Contact destiné aux médias
  • Communiqués de presse
  • Social Media Newsroom

Suivez le PSI: Twitter (en allemand) LinkedIn Youtube Issuu RSS

Footer legal

  • Impressum
  • Conditions d'utilisation
  • Login éditeurs