Call for Proposals for µSR Experiments at the SµS

NEXT DEADLINE for submission in DUO (call 1/2027):

  • December 1, 2026, 23:59 CEST.

ALLOCATION PERIOD:

  • For the instruments FLAME, GIANT/MIXE, GPD, GPS, HAL-9500, LEM and VMS:  June to September 2027.

IMPORTANT NOTES:

  • The planned HIMB upgrade of the HIPA facility has been postponed by one year to begin in January 2028, until September 2029. This means that there will be no calls for 2028 and only one call in 2029 for the period September to December.
  • The instruments GIANT/MIXE and VMS will not be available for call 2/2027.
  • DOLLY has become the Versatile Muon Spectrometer (VMS) after spectrometer and sample environment upgrade in 2025.
  • If you are not sure about the most suitable instrument for your research, necessary sample mass and sample alignment or any other experimental issue please discuss with the instrument scientists before the submission of the proposal.

Proposals have to be submitted via the DUO web interface. Please note, that the main text/description of the proposal, including figures, has to be uploaded as a pdf file, with a maximum of 3 pages and a maximum size of 4 MB.

For details about the PSI User Office, see here

For a description of the instruments see here.

In addition to the normal access mode (i.e. Proposals) beam time can possibly be obtained through Requests for Urgent Beam Time (see below).

1. Proposals

  • Allocation periods: see above.
  • Deadline for submission in DUO for call 1/2027: December 1, 2026, 23:59 (Swiss time, CEST).
  • Please note: this is a hard deadline - post deadline editing of proposals will be disabled. 

2. Requests for Urgent Beam Time (Director's Discretion Time)

Reserved for feasibility tests or urgent measurements on new materials. A very limited amount of beam time is reserved for urgent beam time requests. For the request of urgent beam time (typically 1 or 2 days) an informal letter containing the relevant information about the project, the sample, the requested instrument and number of necessary days may be addressed electronically at any time of a running cycle to: