Aller au contenu principal
  • Paul Scherrer Institut PSI
  • PSI Research, Labs & User Services

Digital User Office

  • Digital User Office
  • DE
  • EN
  • FR
Paul Scherrer Institut (PSI)
Rechercher
Paul Scherrer Institut (PSI)

Hauptnavigation

  • Research at PSIOuvrir ce point de menu principal
    • Research Initiatives
    • Ethics and Research integrity
    • Scientific Highlights
    • Scientific Events
    • Scientific Career
    • PSI-FELLOW
    • PSI Data Policy
  • Research Divisions and LabsOuvrir ce point de menu principal
    • Overview
    • Research with Neutrons and Muons
    • Photon Science
    • Energy and Environment
    • Nuclear Energy and Safety
    • Biology and Chemistry
    • Scientific Computing, Theory and Data
    • Large Research Facilities
    • Logistics
  • Facilities and InstrumentsOuvrir ce point de menu principal
    • Overview
    • Large Research Facilities
    • Facilities
    • PSI Facility Newsletter
  • PSI User ServicesOuvrir ce point de menu principal
    • User Office
    • Methods at the PSI User Facilities
    • Proposals for beam time
    • Proposal Deadlines
    • Data Analysis Service (PSD)
    • EU support programmes
  • New ProjectsOuvrir ce point de menu principal
    • SLS 2.0
    • IMPACT
  • DE
  • EN
  • FR

Digital User Office (mobile)

  • Digital User Office

Vous êtes ici:

  1. PSI Home
  2. Labs & User Services
  3. PSD
  4. SLS
  5. XTreme
  6. Status

Navigation secondaire

XTreme

  • Status
  • User Information
    • Operation Schedule
    • Manuals
    • FAQ
  • People
  • Beamline Layout
    • Source
    • Optics
  • Endstations
  • Publications
  • Scientific Highlights and News
  • Contacts

Info message

Ce contenu n'est pas disponible en français.

Beamline Status

Ressource Status Description
Status optics and monochromator OK Beamline optics 80% commissioned
Status sample and environment OK Measurement conditions: 7T-2T magnetic field, 2K.
In-situ preparation chamber available
Status endstations and detectors OK End-station in operation.
Detection mode: Total electron yield. If requested, total fluorescence yield or transmission can be acquired in parallel to TEY.
Status analysis tools OK Basic tools for analysis
Status operation OK Fully open to users
Legend OK PROBLEMS ERROR

Beamline milestones

Date Description
Oct/2008 Start beamline construction
Oct/2009 First light
Jul/2010 End-station delivered and acceptance test complete
2011 Pilot Experiments
2012-2013 Beamline partially open for users
since Jan/2014 Beamline fully open to users

Sidebar

Further Information

  • Accelerator Staff (Contacts)
  • Accelerator Division (GFA)
    Organisation, activities and further information

View Full SLS Status

top

Pied de page

Paul Scherrer Institut

Forschungsstrasse 111
5232 Villigen PSI
Suisse

Téléphone: +41 56 310 21 11
Téléfax: +41 56 310 21 99

Comment nous trouver 
Contact

Centre de visiteurs psi forum
Laboratoire élèves iLab (en allemand)
Centre de protonthérapie
Centre de Formation du PSI
PSI Guest House (en anglais)
PSI Gastronomie (en allemand)
psi forum shop

Service & Support

  • Annuaire
  • User Office
  • Accelerator Status
  • Publications du PSI
  • Fournisseurs
  • E-facture
  • Computing (en anglais)
  • Sicherheit (en allemand)

Carrière

  • Travailler au PSI
  • Offres d'emploi
  • Formation initiale et formation continue
  • Career Center
  • Formation professionnelle (en allemand)
  • Centre de Formation du PSI

Pour les médias

  • Le PSI en bref
  • Chiffres et faits
  • Le coin médias
  • Communiqués de presse
  • Réseaux sociaux

Suivez le PSI: Twitter (in English) LinkedIn Youtube Facebook Instagram Issuu RSS

Footer legal

  • Impressum
  • Conditions d'utilisation
  • Login éditeurs