Status

X03DA-ES-PS1-002-600x200.jpg

Expected status of the facilities for the next half year (updated 2025-12-01). Availability of facilities subject to change without notice for technical reasons. Please ask if you have specific requirements.

Following the upgrade of the SLS storage ring, PEARL is currently under reconstruction. No synchrotron light is available at PEARL until the new beamline is commissioned in 2026. The endstation (sample preparation, STM, XPS/ARPES with lab source) remains operational until June 2026. Please ask the beamline manager if you have any requests for experiments at PEARL.

Facility

Status

Notes

Sources

Synchrotron radiation

not available

SLS upgrade

He Iα, He IIα (monochromatized)

ask

 

Mg Kα, Si Kα (unmonochromatized)

ask

 

Photoelectron Spectroscopy (XPS/XPD/PhD/ARPES)

Electron spectrometer (Scienta DFS30)

ask

 

Angle scans

not available

 

Photon energy scans

not available

SLS upgrade

ARPES, Fermi surface mapping

ask

 

Manipulator cooling

ask

35 K

Temperature programming

not available

T < 500 K

Operando measurements

not available

 

Remote control

not available

 

Scanning Tunnelling Microscopy (STM/STS)

Microscopy (Omicron LT-STM, Nanonis control system)

ask

 

Spectroscopy

ask

 

Sample temperature

ask

4 K, 77 K

Remote control (scanning only)

not available

 

AFM (ex situ)

ask

 

Sample entry

Fast entry lock

ask

 

Glove box transfer

ask

 

Sample preparation

Ar sputtering

ask

 

Heating, radiative

ask

1200 K

Heating, direct current

ask

12 A

Heating, e-beam

ask

1500 K

Pyrometer

ask

 

Cooling

ask

90 K

Organic multi-evaporator

ask

900 K

Accessory ports

ask

2 ports

LEED/Auger

ask

 

QMS/RGA

ask

 

Gas dosing

ask

Messer CANgas

Chemistry lab access

not available

 

Sample preparation, STM system

Ar sputtering

ask

 

Heating, radiative

ask

1200 K

Cooling

ask

140 K

Accessory ports

ask

2 ports

Further Information