Today Mu3e was craned from the staging setup to the PiE5 area, where the experiment was inserted into the Mu3e magnet. This brings us a big step closer to the 2026 beam time - all cables now have to be re-connected and qualified and then we can begin full detector operation.
Prof. André Schöning