programmausschnitt.png


The Accelerator Schedules

The scheduled down-times for the High Intensity Proton Accelerator (HIPA) can be looked up via the link on the left, called the HIPA beam schedule (in German). The COMET schedule indicates the planned maintenance for Protontherapy (PROSCAN) (in German). The Swiss Light Source (SLS) has a half year schedule, in which machine down-time and beam-development is listed (shown in DUO). The SLS Schedule on the left is an extract of this site and put into the same format as the proton accelerators.

Minutes of the weekly meeting BPA reports (in German) about status of the accelerator HIPA and PROSCAN in Intranet only. The transcript of the SLS-meeting can only be read internally. An overview of all accelerator schedules is provided for site planning.